PERRY over TROTTERS CREEK

0.14 E OF CR261 · County 109, Ohio · Built 1960 · 2 Lanes · 485 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
5533910
Year Built
1960
Length
16.5 m (54.1 ft)
Max Span
15.9 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
485
Material
Steel
Design
Girder and Floorbeam System
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$134,000
Total Project Cost
$154,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.