SR-55 over IR 75

JCT.IR-75 · County 109, Ohio · Built 1957 · 2 Lanes · 8,933 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
5501385
Year Built
1957
Reconstructed
2002
Length
74.5 m (244.4 ft)
Max Span
22.9 m
Width
16.9 m (55.4 ft)
Lanes
2
Daily Traffic
8,933
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.