C39 HEMLOCK GROVE over W. BR. SHADE RIVER

0.534 MILE N. OF T162 · County 105, Ohio · Built 2024 · 2 Lanes · 213 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
5331250
Year Built
2024
Length
18.9 m (62 ft)
Max Span
18 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
213
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.