SR 303 over DRAINAGE DITCH

1.56 MI E OF US 42 · County 103, Ohio · Built 1985 · 5 Lanes · 27,043 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
5207789
Year Built
1985
Length
19.5 m (64 ft)
Max Span
18.9 m
Width
22.6 m (74.1 ft)
Lanes
5
Daily Traffic
27,043
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.