SR 94 over EAST BRANCH ROCKY RIVER

0.04 MI N OF SR606 · County 103, Ohio · Built 2019 · 2 Lanes · 6,980 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
5205795
Year Built
2019
Length
30.2 m (99.1 ft)
Max Span
10.5 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
6,980
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.