IR 71 over OVER CAMEL CREEK

3.51 MILES NORTH OF SR 83 · County 103, Ohio · Built 2005 · 3 Lanes · 25,562 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
5202663
Year Built
2005
Length
33.5 m (109.9 ft)
Max Span
32.6 m
Width
19.2 m (63 ft)
Lanes
3
Daily Traffic
25,562
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.