SR 746 over OTTER CREEK

0.36 MI S OF SR95 · County 101, Ohio · Built 1961 · 2 Lanes · 516 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
5103908
Year Built
1961
Length
24.4 m (80.1 ft)
Max Span
8.5 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
516
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.