GARFIELD RD. over HONEY CREEK

0.5MI.E OF S.R.170 · County 099, Ohio · Built 1949 · 2 Lanes · 762 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
5056241
Year Built
1949
Length
15.2 m (49.9 ft)
Max Span
13.7 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
762
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$160,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.