SOUTH AVE / SR164 over I76 OHIO TURNPIKE

1.2 miles east of SR 7 · County 099, Ohio · Built 2019 · 3 Lanes · 12,310 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
5029784
Year Built
2019
Length
77.6 m (254.6 ft)
Max Span
22.9 m
Width
20.1 m (65.9 ft)
Lanes
3
Daily Traffic
12,310
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.