US 422 over LINCOLN PARK & DRY RUN

3.00 MI E OF SR 193 · County 099, Ohio · Built 1958 · 4 Lanes · 11,280 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
5005493
Year Built
1958
Reconstructed
1989
Length
186.5 m (611.9 ft)
Max Span
50.3 m
Width
19.4 m (63.6 ft)
Lanes
4
Daily Traffic
11,280
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$850,000
Total Project Cost
$1,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.