I.R. 76 over LAKE MILTON

1.93 MI W OF SR 534 · County 099, Ohio · Built 1967 · 2 Lanes · 14,055 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
5002702
Year Built
1967
Reconstructed
2003
Length
638.6 m (2095.1 ft)
Max Span
36.3 m
Width
16.8 m (55.1 ft)
Lanes
2
Daily Traffic
14,055
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.