POTEE RD over DEER CREEK

0.16 MI N OF US 40 · County 097, Ohio · Built 1955 · 2 Lanes · 382 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair

Bridge Details

Structure #
4931289
Year Built
1955
Reconstructed
2004
Length
14.3 m (46.9 ft)
Max Span
13.7 m
Width
5.5 m (18 ft)
Lanes
2
Daily Traffic
382
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$44,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.