KEY ST over I80 OHIO TPK

1.2MI EAST OF EXIT 59 · County 095, Ohio · Built 1954 · 4 Lanes · 6,394 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
4829808
Year Built
1954
Reconstructed
1983
Length
61.9 m (203.1 ft)
Max Span
20.1 m
Width
16.2 m (53.1 ft)
Lanes
4
Daily Traffic
6,394
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.