SR 295 over MIAMI ERIE CANAL

SR 295 & MIAMI ERIE CANAL · County 095, Ohio · Built 1994 · 2 Lanes · 2,654 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
4808738
Year Built
1994
Length
9.8 m (32.2 ft)
Max Span
9.8 m
Width
17.4 m (57.1 ft)
Lanes
2
Daily Traffic
2,654
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.