SUDER AVENUE over IR 75

1/4 MI N ALEXIS RD INTER · County 095, Ohio · Built 1998 · 4 Lanes · 4,623 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
4804759
Year Built
1998
Length
77.4 m (253.9 ft)
Max Span
37.8 m
Width
20.2 m (66.3 ft)
Lanes
4
Daily Traffic
4,623
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.