SUDER AVENUE over IR 75
1/4 MI N ALEXIS RD INTER · County 095, Ohio · Built 1998 · 4 Lanes · 4,623 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
41.7261, -83.494775
This bridge is in worse condition than 43.6% of bridges in County 095. The average bridge in Ohio is 0 years old; this one is 28 years old.
Nearby Bridges
SR 184 over IR 75
Built 1975
SR 184 over CANADIAN NATIONAL RR
Built 1975
HAGMAN ROAD over SILVER-SHANTEE CREEK
Built 1971
SUMMIT STREET over OTTAWA RIVER
Built 1940
SUDER ROAD over HALFWAY CREEK
Built 1994
I-75 SB over HALFWAY CREEK
Built 2020
I-75 NB over HALFWAY CREEK
Built 2019
BENORE RD over CN RR
Built 1957
SUMMIT ST over SHANTEE CREEK
Built 1936
BENORE ROAD over IR 75
Built 1997
Bridge Details
- Structure #
- 4804759
- Year Built
- 1998
- Length
- 77.4 m (253.9 ft)
- Max Span
- 37.8 m
- Width
- 20.2 m (66.3 ft)
- Lanes
- 4
- Daily Traffic
- 4,623
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.