INDIANA AVE over IR 75
IR 75 UNDER INDIANA AVE. · County 095, Ohio · Built 2018 · 2 Lanes · 13,500 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
41.650361, -83.54905
This bridge is in worse condition than 9.4% of bridges in County 095. The average bridge in Ohio is 0 years old; this one is 8 years old.
Nearby Bridges
SR 246 (DORR ST.) over IR 75
Built 2019
IR 75 Ramp over SR 25 SB SR 25 Ramp A
Built 2022
Nebraska Ave. over I75 S25N M2162 3 RMPS
Built 2022
COLLINGWOOD BLVD. over IR 75
Built 1968
SR 25 over SWAN CREEK
Built 1963
SR 25 over SWAN CREEK
Built 1963
IR 75 Ramp over SWAN CREEK
Built 2022
ST. CLAIR STREET over SWAN CREEK
Built 1993
IR 75 over SWAN CREEK & SR 25
Built 2022
SR 25 over COLLINGWOOD BLVD
Built 1963
Bridge Details
- Structure #
- 4803095
- Year Built
- 2018
- Length
- 53.5 m (175.5 ft)
- Max Span
- 30.5 m
- Width
- 17.2 m (56.4 ft)
- Lanes
- 2
- Daily Traffic
- 13,500
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.