IR 75 over ERIE ST. SWAN CR SR 25

1.52 MI. NORTH of SR 65 · County 095, Ohio · Built 2021 · 3 Lanes · 43,980 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
4802943
Year Built
2021
Length
567.5 m (1861.9 ft)
Max Span
61 m
Width
19.2 m (63 ft)
Lanes
3
Daily Traffic
43,980
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.