MOORE ROAD over POWDERMAKER CREEK
0.6 MILE S. OF WALKER RD · County 093, Ohio · Built 2019 · 2 Lanes · 3,195 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
41.484719, -82.0471
This bridge is in worse condition than 9.5% of bridges in County 093. The average bridge in Ohio is 0 years old; this one is 7 years old.
Nearby Bridges
SR 611 over OVER LOR-090-1882
Built 1970
IR 90 over POWDERMAKER DITCH
Built 1966
SR 301 over OVER N&W RR AND ROAD
Built 1995
RECREATION LANE over FRENCH CREEK
Built 2008
RECREATION LANE over FRENCH CREEK
Built 2011
IR 90 over FRENCH CREEK
Built 1970
IR 90 over FRENCH CREEK
Built 1970
SR 83 over OVER LOR-090 -2054
Built 1970
SR 83 over OVER LOR-090 -2055
Built 1970
SPINNAKER DRIVE over HEIDER DITCH
Built 1978
Bridge Details
- Structure #
- 4760020
- Year Built
- 2019
- Length
- 7.9 m (25.9 ft)
- Max Span
- 6.4 m
- Width
- 14.9 m (48.9 ft)
- Lanes
- 2
- Daily Traffic
- 3,195
- Material
- Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.