MOORE ROAD over POWDERMAKER CREEK

0.6 MILE S. OF WALKER RD · County 093, Ohio · Built 2019 · 2 Lanes · 3,195 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
4760020
Year Built
2019
Length
7.9 m (25.9 ft)
Max Span
6.4 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
3,195
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.