Gore Orphanage Rd over E.F. Vermilion River

0.29 mi south of Becker · County 093, Ohio · Built 2024 · 2 Lanes · 250 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
4735723
Year Built
2024
Length
24 m (78.7 ft)
Max Span
22.9 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
250
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.