EB TPK RP TO I480 over I80 OHIO TURNPIKE

AT EXIT 9A · County 093, Ohio · Built 1981 · 2 Lanes · 8,955 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
4729811
Year Built
1981
Length
110 m (360.9 ft)
Max Span
34.1 m
Width
15 m (49.2 ft)
Lanes
2
Daily Traffic
8,955
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.