TPK EXIT 142 RAMP over I80 OHIO TPK

AT EXIT 8A · County 093, Ohio · Built 1974 · 2 Lanes · 3,911 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
4729293
Year Built
1974
Reconstructed
2000
Length
94.5 m (310 ft)
Max Span
28.3 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
3,911
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.