IR 90 over Over Lor 057 19.16

1.24 Mile E. of SR 2 · County 093, Ohio · Built 2018 · 2 Lanes · 25,958 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
4710001
Year Built
2018
Length
55.5 m (182.1 ft)
Max Span
27 m
Width
19.3 m (63.3 ft)
Lanes
2
Daily Traffic
25,958
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.