EB I-70 over BUCKEYE LAKE OVERFLOW
.1 ME OF JCT SR 79 · County 089, Ohio · Built 1958 · 2 Lanes · 19,521 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.945322, -82.478161
This bridge is in worse condition than 38% of bridges in County 089. The average bridge in Ohio is 0 years old; this one is 68 years old.
Nearby Bridges
WB I-70 over BUCKEYE LAKE OVERFLOW
Built 1958
NE RAMP 70 TO 79 over NE RAMP OVER OVERFLOW
Built 1958
SR 79 over SR 79 OVER IR70
Built 1958
SR 79 over OVER BUCKEYE L. OVERFLOW
Built 1958
STATE ROUTE 79 over OVER SO FORK LIC RIVER
Built 1958
GATEWAY CROSSING over WASTE WEIR RUN
Built 2022
CR 489 over CR489 OVER I70
Built 1958
WB I-70 over IR70 OVR S.F. LICKING RI
Built 1958
EB I-70 over IR70 OVR S.F. LICKING RI
Built 1958
US 40 over SOUTH FORK LICKING RIV
Built 1994
Bridge Details
- Structure #
- 4503724
- Year Built
- 1958
- Length
- 26.2 m (86 ft)
- Max Span
- 10.1 m
- Width
- 14.4 m (47.2 ft)
- Lanes
- 2
- Daily Traffic
- 19,521
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.