SR 13 over SR 13 OVER SR 16 & 79

SR 13 OVER SR 16 & 79 · County 089, Ohio · Built 2017 · 4 Lanes · 15,300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
4500679
Year Built
2017
Length
51.8 m (169.9 ft)
Max Span
15.1 m
Width
21.7 m (71.2 ft)
Lanes
4
Daily Traffic
15,300
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.