LEATHERWOOD ROAD over LEATHERWOOD CREEK

.40 MI.N. OF SR. 243 · County 087, Ohio · Built 1900 · 2 Lanes · 294 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
4436814
Year Built
1900
Reconstructed
1991
Length
11.6 m (38.1 ft)
Max Span
11 m
Width
6 m (19.7 ft)
Lanes
2
Daily Traffic
294
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$22,000
Total Project Cost
$28,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.