COUNTY ROAD 6 over TRIB OF ICE CREEK

65 FT W OF TWP RD 117N · County 087, Ohio · Built 1920 · 1 Lanes · 873 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
4431669
Year Built
1920
Length
8.8 m (28.9 ft)
Max Span
7.3 m
Width
5.3 m (17.4 ft)
Lanes
1
Daily Traffic
873
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$27,000
Total Project Cost
$34,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.