COUNTY ROAD 4 over SLAB FORK CREEK

7.67 MI N OF S.R. 93 · County 087, Ohio · Built 1900 · 2 Lanes · 479 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
4430654
Year Built
1900
Reconstructed
1991
Length
7.3 m (24 ft)
Max Span
6.4 m
Width
6.4 m (21 ft)
Lanes
2
Daily Traffic
479
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$14,000
Total Project Cost
$19,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.