SR 775 over SAND FORK CREEK

.31 MI S OF GALLIA COUNTY · County 087, Ohio · Built 1914 · 2 Lanes · 204 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
4405013
Year Built
1914
Reconstructed
1980
Length
16.2 m (53.1 ft)
Max Span
14.3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
204
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.