IR271NBtogoIR90EB over Eddy Rd. (CR-541)

@ IR-271/IR-90 Interchang · County 085, Ohio · Built 2021 · 2 Lanes · 20,609 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
4305494
Year Built
2021
Length
45.4 m (149 ft)
Max Span
18.6 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
20,609
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.