SR 86 over BATES CRK 1 MI W CTY LIN

APPROX.5 MI E PROCTOR · County 085, Ohio · Built 1993 · 2 Lanes · 4,341 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
4303326
Year Built
1993
Length
36.9 m (121.1 ft)
Max Span
14 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
4,341
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.