NEWELL ST over SR 2

0.48 MI W OF JCT SR 283 · County 085, Ohio · Built 1963 · 2 Lanes · 2,876 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
4301358
Year Built
1963
Reconstructed
2018
Length
71.9 m (235.9 ft)
Max Span
21.3 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
2,876
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.