TR278 over Hump Run

1.2 Mi N of SR524 · County 081, Ohio · Built 2017 · 1 Lanes · 100 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
4133618
Year Built
2017
Length
7.3 m (24 ft)
Max Span
6.7 m
Width
10.7 m (35.1 ft)
Lanes
1
Daily Traffic
100
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$73,217,000
Total Project Cost
$73,217,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.