COUNTY RD 22A over COLUMB&OHIO RAILROAD

3.03 MI E. OF SR 152 · County 081, Ohio · Built 1928 · 2 Lanes · 2,277 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
4131061
Year Built
1928
Reconstructed
2002
Length
16.8 m (55.1 ft)
Max Span
15.5 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
2,277
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.