SR 213 over COL & OH RIVER RR

.11 MI S OF SR 7 · County 081, Ohio · Built 1926 · 2 Lanes · 1,858 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
4103270
Year Built
1926
Reconstructed
1986
Length
19.2 m (63 ft)
Max Span
18.6 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
1,858
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.