SR 152 over OVER US 22

AT INTERCHANGE WITH US 22 · County 081, Ohio · Built 1969 · 2 Lanes · 308 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
4102797
Year Built
1969
Reconstructed
2008
Length
87.8 m (288.1 ft)
Max Span
24.7 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
308
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$125,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.