ZOAR CHURCH over SYMMES CR

0.4 MI S OF CR45 · County 079, Ohio · Built 1902 · 2 Lanes · 324 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
4032179
Year Built
1902
Reconstructed
1988
Length
11 m (36.1 ft)
Max Span
10.4 m
Width
5.5 m (18 ft)
Lanes
2
Daily Traffic
324
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$30,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.