CR 84 over USR 35

OVER USR 35 · County 079, Ohio · Built 1988 · 2 Lanes · 1,881 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
4000196
Year Built
1988
Length
90.5 m (296.9 ft)
Max Span
25 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
1,881
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.