BASELINE 011 over BASELINE / CO DI 1750

0.5 MI E OF SR 61 · County 077, Ohio · Built 2023 · 2 Lanes · 663 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
3930020
Year Built
2023
Length
19.2 m (63 ft)
Max Span
18.3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
663
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.