SR 547 over TRIB W BR HURON RIVER

6.51 MILES NORTH OF SR 4 · County 077, Ohio · Built 2023 · 2 Lanes · 890 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
3904327
Year Built
2023
Length
11.2 m (36.7 ft)
Max Span
10.4 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
890
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.