SR 134 over FLAT RUN

1.73 MI N OF BROWN CTY · County 071, Ohio · Built 1958 · 2 Lanes · 1,016 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
3602281
Year Built
1958
Length
30.2 m (99.1 ft)
Max Span
10.7 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
1,016
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.