Twp. Rd. U3 over DITCH 843 DRY CREEK

0.24 mi. west of Rd. 8 · County 069, Ohio · Built 1968 · 1 Lanes · 351 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
3532062
Year Built
1968
Reconstructed
1995
Length
10.1 m (33.1 ft)
Max Span
9.1 m
Width
7.1 m (23.3 ft)
Lanes
1
Daily Traffic
351
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.