County Road 15 over Holden Joint Ditch

.4 MI N OF JCT TWP RD 180 · County 065, Ohio · Built 2014 · 2 Lanes · 477 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
3330003
Year Built
2014
Length
14.5 m (47.6 ft)
Max Span
9.1 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
477
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.