SR 81 over HOG CREEK

3.36 mi East of SR 235 · County 065, Ohio · Built 1966 · 2 Lanes · 1,055 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
3301028
Year Built
1966
Length
28.3 m (92.8 ft)
Max Span
10.7 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
1,055
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,171,000
Total Project Cost
$1,171,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.