SR 31 & 53 S MAIN over SCIOTO RIVER #

0.45 mi. North of SR53 · County 065, Ohio · Built 1968 · 4 Lanes · 9,687 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
3300366
Year Built
1968
Length
44.4 m (145.7 ft)
Max Span
14.3 m
Width
20.2 m (66.3 ft)
Lanes
4
Daily Traffic
9,687
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$63,000
Total Project Cost
$70,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.