HAN CO RD 304 over STONE JT CO DITCH

0.12 MI W CR 183 · County 063, Ohio · Built 1958 · 2 Lanes · 251 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
3236382
Year Built
1958
Reconstructed
2009
Length
9.1 m (29.9 ft)
Max Span
8.2 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
251
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$29,000
Total Project Cost
$45,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.