SR 235 over BLANCHARD RIVER

0.48 mi. South of USR224 · County 063, Ohio · Built 1962 · 2 Lanes · 950 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
3204561
Year Built
1962
Reconstructed
2004
Length
101.1 m (331.7 ft)
Max Span
27.4 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
950
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$77,738,000
Total Project Cost
$322,738,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.