CR 99 over IR 75

.5 MI NORTH OF FINDLAY · County 063, Ohio · Built 1999 · 4 Lanes · 18,602 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
3203131
Year Built
1999
Length
50.4 m (165.4 ft)
Max Span
24.5 m
Width
18.1 m (59.4 ft)
Lanes
4
Daily Traffic
18,602
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.