IR 75 over Twp89/Blanchard/CR223

0.5 Mi. S of SR 224 · County 063, Ohio · Built 2019 · 3 Lanes · 26,248 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
3203018
Year Built
2019
Length
103.9 m (340.9 ft)
Max Span
41.4 m
Width
19.8 m (65 ft)
Lanes
3
Daily Traffic
26,248
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.