IR 75 NB over CR33 & ABANDONED RR

0.33 mi. North of SR103 · County 063, Ohio · Built 1954 · 3 Lanes · 15,033 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
3202283
Year Built
1954
Reconstructed
1994
Length
65 m (213.3 ft)
Max Span
13.7 m
Width
15.7 m (51.5 ft)
Lanes
3
Daily Traffic
15,033
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.