SOUTH SHORE DRIVE over DALY CREEK

0.2 MI E OF DALY ROAD · County 061, Ohio · Built 1953 · 2 Lanes · 500 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
3190102
Year Built
1953
Length
12.2 m (40 ft)
Max Span
5.5 m
Lanes
2
Daily Traffic
500
Material
Steel
Design
Culvert
Owner
Local Park, Forest, or Reservation Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.